|
PROJECT: HILTON HOTEL - TULLAMARINE
ADDRESS: HOTEL ARRIVAL DRIVE - TULLAMARINE
CLIENT: HOOKER COCKRAM
COMPLETION: 2001
OUR
WORKS:
Barry Tanner and Associates P/L were engaged to recommend
and install a suitable membrane system for the roof of the
Hotel. The abundance of ductwork and substrate penetrations
on the roof area made installing a conventional sheet membrane
system virtually impossible.
|